問題詳情

22. The government is planning to build a ________ high way through the city.
(A)two-lanes
(B) time-saved
(C) three-lanned
(D) four-lane

參考答案

答案:D[無官方正解]
難度:適中0.4
統計:A(4),B(0),C(2),D(4),E(0)

內容推薦